When a scene copy is called, all viewlayers are ensured before they are
copied. In case of multiple viewlayers, a viewlayer can be out of sync.
This triggers an assert in the BKE_view_layer_copy_data.
Details
Details
Diff Detail
Diff Detail
- Repository
- rB Blender
- Branch
- scene_copy_viewlayer_assert_T101394 (branched from master)
- Build Status
Buildable 24210 Build 24210: arc lint + arc unit