This task is a list of things that will have to be done for the 2.8 release:
= Schedule
A set schedule is still not set date on when we should start modifying the actual repository so, for now, we are in a planning phase.
= Removals
- Frame server removed
- BGE removed
- Armature sketching removed
- Internal removed
- Texface removed
= Moves/Changes
- Groups and layers are now both "Collections"
- Timeline
= Additions
- Rendering
- EEVEE
- Workbench
- Cycles
- random walk subsurface scattering
- 3D View
- Multiobject editing
- 3d Cursor
- UI
- Tools (only 3D for now)
- Grease Pencil 2.0 (is there a better place we can put this?) (Split annotation tool from 3d drawing?)
- Toolbar
- Manipulators
= Document Structure
We should discuss some structure for some pages that we might want to change.
= Rendering
- render_engines/
- eevee
- cycles
- workbench
- clay??? (is this staying??)
- Nodes? -- Same nodes are used in cycles and Eevee.